[MYRG] MYR Group Thesis 2026: Grid + Data Center Supercycle Drives Margin Expansion
MYR Group FY2025 operating income surged to ~$167M (+208% YoY) at ~4.6% OI margin as electrical contractor benefited from dual tailwinds: utility T&D capex acceleration (~$2.1B T&D revenue) and hyperscaler data center electrical buildout (~42% of C&I backlog, ~$1.55B segment). Backlog reached ~$3.3B — approximately 11 months of forward revenue. FY2026 thesis: sustained AI infrastructure investment (Microsoft/Google/Amazon multi-year capex commitments) maintains C&I data center mix at 40-45%; FERC Order 1977 and IIJA funding sustains T&D capex cycle; execution discipline on fixed-price C&I contracts (after FY2024 cost overrun episode) maintains OI margin at 4-5%+ range.
Research · Aug 25, 2026
Power Grid Construction Now Capped by Installation Capacity
Contact Energy, Mercury NZ and Alfen told August 2026 calls that build and installation capacity, not permits or demand, now sets power delivery.