Skip to content
B

Barrick Mining Corp.

Barrick Mining Corp. Q3 FY2024 earnings call

November 7, 2024 · fiscal period ended 2024-09

EPS · actual vs est

$0.31 / $0.33Miss -6.1%

Revenue · actual vs est

$3.37B / $401.5MBeat +738.9%
Ask about this call

Summary

Generated 2024-11-07

Management highlights

  • Safety: Journey to zero impacted by a fatality at Kobali, but four lost-time injury-free months and decreasing injury rates are encouraging. - Mine closure liabilities: Methodically moving to non-operating tailings storage facilities, reduced closure liabilities by over $1 billion (36% reduction). - North American operations: Substantial investment in Nevada mines, Gold Quarry Roaster expansion completed, New Goldrush mine ramping up. Fourmile project: World-class asset with potential, drill testing ongoing. - Latin America and Asia Pacific: Pueblo Viejo plant ramp-up, Porgera production increase despite challenges, Reko Diq copper-gold project on track for feasibility study by end of 2024. - African and Middle East: Lumwana and Loulo-Gounkoto as cash generators, Kibali's renewable energy initiatives, ongoing negotiations in Mali regarding benefit sharing.
View in transcript ↓

Segment performance

Gold operations: Higher performance driven by higher gold price and cost discipline. Gold production in line with previous quarter; cost per ounce increased due to planned maintenance and royalties, partially offset by sustaining capital. Copper production up 12% quarter on quarter, costs reduced. Pueblo Viejo: Plant ramp-up, 23% quarterly production increase, unit costs reduced, targeting annual average gold production over 800,000 ounces to 2040. Porgera: 64% quarter-on-quarter production increase in Q3 despite challenges. Lumwana: Cash generator, feasibility study scheduled for completion by end of year. Loulo-Gounkoto: Production up 5% quarter on quarter, expected full-year production at top end of guidance range. Revenue contribution details not explicitly provided in the transcript to calculate percentages.

View in transcript ↓

Guidance

  • Production guidance within range but at lower end. - PV ramping up into next year, focus on cost control rather than production. - Update on investor day on 22nd November with detailed plans. - Expect all-in sustaining costs to come down through various investments and optimizations. - Guidance on costs rather than production in some segments like LATAM.
View in transcript ↓

Risks

  • Safety: Fatality at Kobali impacted safety journey. - Operational: Pueblo Viejo commissioning plagued by equipment failures and conveyor collapse. Nevada Gold Mines facing challenges with Gold Quarry pit sidewall failure. - Negotiations: Uncertainty in Mali regarding benefit sharing with the transitional government affecting the complex's sustainability.
View in transcript ↓

Q&A highlights

Q: Dan Major from UBS asked about production guidance, sustaining CapEx, and outlook for 2025.

A: Mark Bristow discussed Nevada's Gold Quarry pit issues, focus on margins over production, investor day details, and cost control in PV and Turquoise Ridge.

Q: Alan Spence from BNP Paribas asked about CapEx guidance, reserve replenishment, and environmental rehab.

A: Graham Shuttleworth and Mark Bristow talked about CapEx guidance, reserve replenishment in different regions, and progress in environmental rehab and mine closure engineering.

Q: Lawson Winder from Bank of America Securities asked about 2025 CapEx, Fourmile resource estimate, and gold price assumption.

A: Mark Bristow and Simon Jimenez mentioned investor day details, Fourmile resource update completion, and gold price assumption of around $1,400.

Q: Anita Soni from CIBC World Markets asked about Nevada Gold Mines grade, Turquoise Ridge struggles, and inflationary pressures.

A: Mark Bristow discussed grade uptick expectations, Turquoise Ridge challenges (backfill infrastructure, process reliability), and cost management strategies.

Q: Tanya Jakusconek from Scotiabank asked about Pueblo Viejo nameplate capacity, Nevada Gold Mines volume, Mali contract, and wage inflation.

A: Mark Bristow and Graham Shuttleworth addressed Pueblo Viejo recovery timeline, Nevada Gold Mines volume constraints, Mali negotiations, and wage inflation range expectations.

View in transcript ↓

Key numbers

Reported versus consensus

Earnings calendar feed

MetricReportedConsensusDeltaPrior year
EPS$0.31$0.33-6.1%$0.24
Revenue$3.37B$401.5M+738.9%$361.0M

Transcript

November 7, 2024

Full transcript unavailable for redistribution

The structured summary above covers the available call sections. Full transcript text is not included on this page.

Continue exploring

Prior quarters

This page presents the stored structured earnings-call summary and deterministic earnings calendar values. How this is generated. For informational purposes only; not investment advice.